The Gas Pre-Heat Station at Devils Dyke

Not complicated in itself but a problem with no water supply and as many rural sites have now a ‘environmental certificate’ which means that all water has taken away by bowser and disposed of in a safe way.

Case Study 1 >>

Off the grid powerflush case study